Lisbon L-Shape Kitchen
Closest product match for the open-plan kitchen module shown in this case.

On-site case · Guangzhou
A multi-room residential installation we built for a Yuexiu District unit. Six custom modules — entryway display cabinet, stainless steel TV wall, kids room, master wardrobe with workstation, walk-in wardrobe + study, and a kitchen island — drawn, fabricated and installed by the same Bogeqi team.
C-04 / Project overview
A whole-home scope delivered as one drawing set and one install. Six modules, one project manager, one handover date.
This is a residential whole-home custom project delivered in a Yuexiu District unit in Guangzhou. The scope covered every custom millwork module in the apartment except the structural ceiling and the soft furnishings. We started from a paper drawing set, agreed the material palette room by room, fabricated in our Foshan workshop, then handled on-site installation across roughly ten working days with a five-person crew.
The client moved in with a young family and a sizeable Bearbrick-style figure collection, which is why the entryway and the walk-in wardrobe both needed a glass display zone rather than the usual closed cabinets. Six modules were delivered as one package: the entryway display cabinet, the living-room stainless steel TV wall system, the kids room wardrobe with study desk, the master bedroom wardrobe with workstation, the walk-in wardrobe with integrated home-office zone, and the open-plan kitchen with bar island.
For an overseas buyer comparing residential stainless steel kitchen and storage suppliers, this Guangzhou whole-home project case shows the full scope we can draw, fabricate and install — from a single island kitchen module to a six-module residence.
The original apartment was a developer-delivery unit with a single duct running across the living-room ceiling and a load-bearing column by the kitchen window. Those two constraints shaped every layout decision.
All cabinetry and metalwork were fabricated in-house. The specification below is the as-built scope, not the design proposal.
The install ran across roughly ten working days. Cabinetry arrived on site in numbered crates, with each module matched to a floor plan location so the crew could place pieces without re-measuring. The TV wall went up first because everything else referenced its datum line; the kitchen island came last because the bar-stool positions needed to be confirmed against the finished floor.
The on-site photographs show the as-built result. No studio lighting, no styling props beyond the client's own furniture and figure collection. The water-mark on every image is the Bogeqi factory mark — we leave it on case images by default and only remove it on request.
A whole-home project magnifies small problems. A particleboard cabinet that swells in a steamy kitchen also swells in a humid closet, and a chipped lacquer door in the living room ages faster than the cabinet next to it. Stainless steel and stainless-clad cabinets take the same kind of punishment in every room, so the finish ages as one.
For this project specifically, three decisions pushed us toward stainless:
For the design decisions behind this build, see the Cabinet trends for 2026: what to keep — the same choices set out across a full kitchen rather than a single case.
If you are scoping a similar whole-home or single-room project, the product pages below cover the modules that overlap with this case.
Real installed project. The visuals are on-site photographs taken after handover of a residential unit in Guangzhou. Dimensions and finish combinations below are verified against the as-built drawing set.
Entryway display cabinet, living-room stainless steel TV wall system, kids room wardrobe with study desk, master bedroom wardrobe with workstation, walk-in wardrobe combined with a home-office zone, and the open-plan kitchen with bar island.
For a multi-room residential scope like this, the typical timeline runs from confirmed drawing to on-site handover in 60 to 90 working days, including factory fabrication, pre-installation QA and final trim. Exact dates depend on the unit size and module mix.
Yes. We deliver single modules as standalone units, but the layout, finish and hardware are easier to align when we see the full-home drawing early. A short call covers which rooms to start with.
Request a quote for a similar scope Review the quality checklist
Closest product match for the open-plan kitchen module shown in this case.
Matte-lacquer handleless fronts used across the wardrobe modules in this case.
Second whole-home residential installation: fluted living-room TV wall, dining area, entryway display, study, balcony utility and a Teka laundry zone.
How the trend set is adapted when a room does not match the catalogue.