Aarhus light-grey stainless steel kitchen cabinets
L-shape kitchen reference in a lighter powder-coat finish for daylight-facing kitchens.
On-site case · Foshan, Guangdong
An L-shape residential kitchen in a Tianyue Shuian Phase 5 apartment in Foshan: soft-beige SUS304 base and wall cabinets, an integrated black-glass appliance stack, a 304 stainless steel counter with a welded sink, and a Calacatta-pattern sintered-stone splashback. Designed from the apartment floor plan, fabricated in our Foshan workshop, installed in one day.

Project case · Tianyue Shuian kitchen
The owner of Unit 1801 in Building 5 of Tianyue Shuian Phase 5 replaced a developer-supplied melamine kitchen with one full stainless steel package: soft-beige powder-coated SUS304 cabinets, a single black-glass appliance column, a food-grade 304 counter with an integrated sink, and a Calacatta-look stone splashback. Site-measured in February 2026, fabricated in two weeks, installed and handed over in one day in March 2026.
C-15 / Project overview
A 12-cabinet L-shape run with a single tall appliance column, a window-side working wall, and a welded stainless steel counter. One drawing set, one installation team, one day on site.







A single residential kitchen in the Tianyue Shuian development, Phase 5, Building 5, Unit 1801 in the Chancheng district of Foshan, Guangdong. The owner approached Bogeqi in late 2025 to replace the developer-supplied kitchen with one full stainless steel package: a food-grade stainless steel counter that would survive direct water and oil exposure, a tall appliance stack that would read as one black-glass column rather than separate boxes, and a cabinetry colour that would sit calmly next to a Calacatta-look stone splashback.
The finished kitchen is a 12-cabinet L-shape run on a roughly 9 m² footprint, with the sink under the window, a welded stainless counter, and a single tall appliance column on the cooking side. It was site-measured on 28 February 2026, fabricated in our Foshan workshop over two weeks, and installed in one working day on 12 March 2026.
Chinese high-rise apartments deliver a developer-supplied kitchen in melamine-faced particleboard. After repeated humidity cycles the edges swell, the kick line lifts, and the cabinet bodies feed mould behind the dishwasher. The owner of this 1801 unit had watched a previous kitchen fail the same way and wanted one material that could survive a small, high-use cooking space without swelling, delaminating or staining.
Every panel was fabricated in our Foshan workshop, not on site. The specification below is the as-built scope, not the design proposal.
Site measure was done on 28 February 2026; the 12-cabinet layout with a line-item quote and an appliance coordination drawing was returned on 5 March. Fabrication took two weeks. The full cabinetry, counter and splashback were delivered on the morning of 12 March and installed in one working day.
The owner walked the kitchen with our installer at handover. Three small items were raised — a drawer pull set proud of the face, a dishwasher door spring set too firm, and a silicone joint at the inside corner — and all three were corrected on site before the installer left. The kitchen was signed off complete the same day. Two weeks later the owner reported that the 304 counter wiped clean with a single pass and showed no oil staining.
Stainless was not a fashion choice in this project. The owner needed one material that could take daily water, steam and oil in a compact room and still read as calm furniture on the open-plan dining side. SUS304 with a 220 degree C polyester powder coat does both: the steel substrate cannot swell, delaminate or feed mould the way a melamine-faced board will, and the powder coat removes the cold industrial look from the room-facing surfaces. The 304 counter takes direct hot-pan contact, boiling water and cleaning chemicals without staining, and the flush appliance column is only possible because the steel frame can be machined and welded to a millimetre reveal without chipping.
Reviewed by the Bogeqi factory QA. This case is based on the as-built drawing set and the on-site photographs in this page, taken after handover.
For the background behind the finishes and hardware shown here, the Cabinet design trends 2026: the guide sets out the same options across the wider range.
All base cabinets, wall cabinets and the integrated counter are SUS304 stainless steel, finished in a low-sheen hairline grain on the counter and a soft-beige polyester powder coat on the cabinetry faces. There is no wood-based substrate in any panel.
The black-glass refrigerator, oven, induction cooktop, side-suction hood and dishwasher are all built into a single tall appliance stack on the cooking side, flush-mounted with the cabinetry faces and trimmed with a stainless steel frame and one continuous reveal.
Blum soft-close runners on every drawer and pull-out, Blum push-to-open hinges on wall cabinets, and Blum AVENTOS lift-up mechanisms on the upper lifts above the cooktop.
A 1.2 mm thick 304 stainless steel counter with an integrated 5 mm raised back edge, plus a Calacatta-pattern sintered-stone splashback that wraps both walls of the cooking run.
Two weeks for shop drawing after the site measure, two weeks for fabrication in our Foshan workshop, and one day for on-site installation. The kitchen was handed over in March 2026.
Yes. Send us your floor plan or photos; we return a dimensioned cabinetry layout, an appliance coordination drawing and a line-item quote within two business days. There is no charge for the first revision.
Request a quote for a similar kitchen Review the quality checklist
L-shape kitchen reference in a lighter powder-coat finish for daylight-facing kitchens.
Second L-shape kitchen reference with a stone worktop and stainless base cabinets.
A gunmetal-grey L-shape kitchen with a sintered-stone island, also in Foshan.
Cleaner types matched to the surface they have to touch.